    Bathroom Remodel Case Study

    Bathroom Remodel Plumbing

    Completed plumbing rough-in and finish work for a bathroom remodel: a new bathtub and shower valve, a relocated toilet connection, and updated plumbing for a repositioned vanity.

    Holly Springs, NC August 2026

    Bathroom Remodel Plumbing in Holly Springs, NC

    Completed plumbing rough-in and finish work for a bathroom remodel: a new bathtub and shower valve, a relocated toilet connection, and updated plumbing for a repositioned vanity.

    Finished tub and shower with white subway tile, a black shower head, handheld attachment and matching tub spout
    New white bathtub set in the framed alcove before tiling, with the shower supply piping at the right
    Opened wall showing the relocated vanity drain, hot and cold supply stub-outs and new PVC waste and vent piping
    Relocated toilet flange set in the subfloor next to an opening showing the new drain connection below
    Finished vanity with a black widespread faucet and matching drain in a white undermount sink
    Vanity plumbing under the sink with a white P-trap, chrome shutoff valves and braided supply lines

    Problem, Diagnosis & Work Completed

    Completed plumbing rough-in and finish work for a bathroom remodel in Holly Springs. The project included a new bathtub and shower valve, relocation of the toilet connection, and updated plumbing for a repositioned vanity.

    Project Requirements:

    • Adapt the existing plumbing to the new bathroom layout.
    • Move the toilet location approximately one foot.
    • Relocate the vanity drain and water connections to align with the new sink.
    • Install new bathtub and shower fixtures.

    Work Completed:

    • Installed a new bathtub with drain and overflow connections.
    • Installed a new shower rough-in valve and piping for the shower head and tub spout.
    • Relocated the toilet drain and flange approximately one foot from the original position.
    • Reconfigured the vanity drain and hot and cold water supply lines.
    • Completed the shower trim installation, including the shower head, handheld attachment, and tub spout.
    • Installed the vanity faucet and sink drain, and connected the P-trap, shutoff valves, and supply lines.

    Result

    The plumbing was reconfigured to accommodate the updated bathroom layout, from concealed rough-in piping to finished fixture connections. The new bathtub, coordinated fixtures, and neatly arranged vanity plumbing complete the plumbing portion of the remodel.

    Project Highlights

    • New bathtub with drain and overflow connections
    • Toilet drain and flange relocated about one foot
    • Shower trim, vanity faucet and P-trap installed